base to CV convert?

Discussion in 'General Discussion' started by grazazel, Nov 23, 2016.

  1. ravien_ff

    ravien_ff Rear Admiral

    Joined:
    Oct 22, 2017
    Messages:
    6,327
    Likes Received:
    11,961
    prefabinfo 'Name of Blueprint' -convert CV
     
    #21
    Needleship likes this.
  2. Rakarr

    Rakarr Ensign

    Joined:
    Feb 19, 2023
    Messages:
    1
    Likes Received:
    0
    "
    No one listed the easiest option?
    1. Place a CV starter block.
    2. Spawn the desired base.
    3. Use the Build menu (N) to select and copy the entire base.
    4. Hit the Deselect button.
    5. Select a block on the CV starter using the build menu selection
    6. Hit Paste twice to paste the base onto the CV.
    7. Boom. The base is now a CV.
    No editing of files. No screwing around. No tutorial videos needed. 100% success rate. Takes about 30 seconds and you don't need to leave the game to do it."
    As stated by Vermillion
    This is by far the easiest way I have found to do this. Simple and easy to remember too!
     
    #22
  3. Sergey Ivanov

    Sergey Ivanov Ensign

    Joined:
    Sep 8, 2022
    Messages:
    1
    Likes Received:
    0
    I know it is a very old post, but I'll still post it here in case some1 will look for this very simple solution as I did lately. It's basaically a visual representation of the above reply.

    here's a detailed guide on how to copy the blueprint over the CV starting block. It does work.
    I created my first CV by hand - copied a wreckage I found in desert by hand :) Wish I knew this way back then :)
    Cheers!
     
    #23
  4. ravien_ff

    ravien_ff Rear Admiral

    Joined:
    Oct 22, 2017
    Messages:
    6,327
    Likes Received:
    11,961
    The console command is much easier and retains signal logic and custom colors, device groups, etc.
     
    #24

Share This Page